Thursday, March 3, 2011

In With the New....Let the Build Begin!!

I have most of the components collected for the brewery build.  The pots have been drilled and welded.  The welds are being cleaned up at the moment.  Here is a picture of the drilled pots on the brew cart.

Top left is the Mash Tun, Top right is the Brew Kettle, and Bottom middle is the HLT.


No comments:

Post a Comment